How we work
From first call to handover
Eight steps. Each one says what you do, what we do and when money changes hands.
| Step | What happens | You | We | Payment |
|---|---|---|---|---|
| 01 | Enquiry | Fill six questions or WhatsApp four site photos | Call back within one working day | None |
| 02 | Site visit | Show us the site and your plans | Load list, cable routes, battery space, roof check | None |
| 03 | Power plan and quote | Review and ask questions | Written plan, fundi brief and fixed quote within 3 working days | None |
| 04 | Agreement | Sign and pay the deposit | Order equipment and confirm the install window | 60% deposit |
| 05 | Pre-wiring check | Your fundi wires to the brief | Inspect before plastering | None |
| 06 | Installation | Give site access | Licensed technicians install, usually in [1-2] days | None |
| 07 | Commissioning | Witness the tests and sign the sheet | Test every circuit and file the EPRA completion certificate | Balance (40%) |
| 08 | Handover and care | Keep the handover pack | As-built drawing, warranties, user guide, named contact | Care plan [INCLUDED / PRICE] |
Start with four photos
Send these on WhatsApp to 0789 470 017 and we'll tell you which package fits before anyone travels.
- The plot from the gate
- The roof or roof plan
- Where the main switchboard will go
- Your floor plan, if you have it
PLACEHOLDER PHOTOWhat the price does not include
Building wiring done by your fundi. Structural roof work. Kenya Power connection. Changes to the plan after the deposit. We list these on every quote.