For people building their own home
Your fundi wires once. Your power stays on.
Backup power is a wiring decision before it's an equipment decision. Get it right while the walls are open and the rest is simple.
PLACEHOLDER PHOTOPlan now or add later
| Item | Planned at walls stage | Added after finishing |
|---|---|---|
| Cables | Hidden in conduit | Surface trunking or cutting into plaster |
| Distribution board | Essential circuits separated from the start | Board rework on a finished wall |
| Battery and inverter | A ventilated space chosen for them | Whatever corner is left |
| Panels | Roof face and fixings agreed with the roofer | Fitted to the roof you already have |
What we do at each stage of your build
- FoundationWe review your plans and flag battery space and roof orientation.
- Walls · best timeSite visit, power plan, fundi wiring brief, fixed quote.
- RoofingPanel fixings agreed with the roofer. Equipment ordered.
- FinishingInstall, test, commission. Handover pack.
- Move-inCare plan starts. A named contact for any fault.
The fundi wiring brief
One page your fundi works from. Free with every power plan.
- Essential-loads circuit, separate from the rest
- Conduit route from the board to the battery space
- Earthing requirements
- Space reserved in the distribution board
- Cable route to the roof for panels
Hot water too
New buildings must now provide for solar water heating in their design under the Energy (Solar Water Heating) Regulations, 2025. We plan it into the same visit.
Fundi or contractor?
Refer a client who's building. Earn KES [AMOUNT] when they pay their deposit, paid by M-Pesa.
Become a referral partner →Walls up this month?
Book the visit before the plaster goes on.