For people building their own home

Your fundi wires once. Your power stays on.

Backup power is a wiring decision before it's an equipment decision. Get it right while the walls are open and the rest is simple.

House roof with solar panelsPLACEHOLDER PHOTO

Plan now or add later

ItemPlanned at walls stageAdded after finishing
CablesHidden in conduitSurface trunking or cutting into plaster
Distribution boardEssential circuits separated from the startBoard rework on a finished wall
Battery and inverterA ventilated space chosen for themWhatever corner is left
PanelsRoof face and fixings agreed with the rooferFitted to the roof you already have

What we do at each stage of your build

  1. FoundationWe review your plans and flag battery space and roof orientation.
  2. Walls · best timeSite visit, power plan, fundi wiring brief, fixed quote.
  3. RoofingPanel fixings agreed with the roofer. Equipment ordered.
  4. FinishingInstall, test, commission. Handover pack.
  5. Move-inCare plan starts. A named contact for any fault.

The fundi wiring brief

One page your fundi works from. Free with every power plan.

  • Essential-loads circuit, separate from the rest
  • Conduit route from the board to the battery space
  • Earthing requirements
  • Space reserved in the distribution board
  • Cable route to the roof for panels

Hot water too

New buildings must now provide for solar water heating in their design under the Energy (Solar Water Heating) Regulations, 2025. We plan it into the same visit.

Fundi or contractor?

Refer a client who's building. Earn KES [AMOUNT] when they pay their deposit, paid by M-Pesa.

Become a referral partner →

Walls up this month?

Book the visit before the plaster goes on.