Homes · Rentals · Businesses · Across Kenya

Building? Plan your power before the walls close.

Wiring for backup power costs least at build stage. We visit your site, map what must stay on, and give you a fixed-price plan your fundi can wire to. When the roof is on, we install, test and hand over with a written warranty.

Installed by EPRA-licensed technicians · Licence no. [PENDING]

Homes with solar panels on their roofsPLACEHOLDER PHOTO

Three packages. Fixed prices.

Each price covers equipment, installation, testing and handover. Your site survey confirms the final figure before you pay anything.

Package 01

Essential

Keeps the basics on

Lights, fridge, Wi-Fi, TV, phone charging, water pump.

From KES [PRICE]
Package 03

Rental Block

For buildings with tenants

Common-area lights, gate, CCTV, booster or borehole pump, plus solar water heating per unit.

Priced per building

What must stay on?

Tick what you need during an outage. We'll point you to a starting package. Your site survey gives the real answer.

Items to keep running
Starting point
Essential package
Confirm with a site visit

How it works

  1. 01 · Walls going upFree power planSite visit. Load list, cable routes, board layout, battery space.
  2. 02 · Within 3 daysFixed quotePackage price, what's included, what isn't. A 60% deposit secures the equipment.
  3. 03 · Roof onInstall and testLicensed technicians fit and commission the system. Balance due at commissioning.
  4. 04 · After handoverCare planScheduled checks, a named contact, priority callback.
The full process, step by step →

Our work

[CASE STUDY 1: owner's home, area, package, before and after photos, the owner's own words. Only with written permission.]
[GOOGLE REVIEWS: rating and count linked to the profile. Hide until 5 real reviews exist.]
[LICENCES: EPRA C1 and V1 numbers and technician licence class. Add when issued.]

Clear payment terms

60% deposit at order. Balance at commissioning. An eTIMS invoice for every payment.

M-PESA PAYBILL [NO.]BANK TRANSFERCARD

Common questions

My house isn't finished. Isn't it too early?

No. Walls going up is the best time. We plan cable routes and board space now, and install once the roof is on.

Do new buildings need solar water heating?

The Energy (Solar Water Heating) Regulations, 2025 require new premises to provide for it in their design. We'll show you what that means for your plans.

What happens if something stops working?

Call or WhatsApp your named contact on 0789 470 017. For no-power faults we respond the next working day.

All questions →

Walls going up? Book your power plan this week.

Six questions. Two minutes. We call you back within one working day.